loading

How to cut and process aluminum alloy lean tubes?

For cutting and processing aluminum alloy lean tubes, cold cutting is the preferred method. Select the appropriate equipment based on the processing scale, and ensure parameter control and post-processing to guarantee the precision of the cut and the performance of the tube material.
How to cut and process aluminum alloy lean tubes?
The SUNQIT dedicated mobile cutting station for different cutting scenarios is made of stainless steel sheet metal. The external frame is composed of third-generation aluminum tubes, connecting pieces, and transparent acrylic sealing plates. It has four universal casters with brakes at the bottom and a foldable platform with a bracket on the right side. It is suitable for cutting aluminum or plastic tubes with a diameter of 28mm, offering high safety levels and allowing for flexible movement.
Small batch/handcraft processing: Utilize manual/electric aluminum alloy saws, paired with high-speed steel saw blades, suitable for 28mm regular outer diameter lean tubes, offering flexible operation and low cost.
Small and medium-sized batch processing: A semi-automatic profile cutting machine is selected, utilizing a gas-oil hybrid power system to drive the tungsten steel circular saw blade. The cutting speed is five times faster than traditional equipment, significantly improving the flatness of the cut.
Large-scale industrial processing: Utilizing a fully automatic aluminum tube cutting machine, the cutting accuracy can be stably controlled within ±0.05mm, and the length of the tail material can be controlled within 5mm. The material utilization rate is increased by 15% compared to traditional equipment, meeting the batch cutting requirements of lean production.
Complex irregular cut processing: Using laser cutting, the cut surface is smooth and burr-free, enabling the processing of special shapes such as bevels and holes. It is suitable for the special pipe fittings required for custom tooling construction.
Key points of cutting operation: Preparation before cutting: Check the sharpness of the saw blade, and test the stability of the speed with a new saw blade by running it idle; gently polish the oxide film at the cut with sandpaper, and prepare a special fixture to fix the pipe to prevent shaking and deviation during cutting.
Parameter control: Ensure the saw blade is perpendicular to the pipe, maintaining a uniform advancing speed between 10-15cm/s. For thin-walled lean pipes, the cutting speed should be between 30-50m/min, while for thick-walled pipes, it should be controlled between 20-35m/min. Use emulsion cooling to prevent the pipe from overheating, oxidizing, and blackening.
Safety and post-processing: Wear goggles and gloves throughout the entire process to prevent aluminum shavings from splashing; after cutting, use a file to polish the cut to remove burrs and residual oxide layers. If subsequent assembly and welding are required, it is recommended to wait 24 hours before proceeding to avoid the impact of residual stress on structural stability.

prev
What is the tutorial for the installation steps of aluminum alloy lean tube connectors?
What is the composite pipe?
next
recommended for you
Get in touch with us
SUNQIT focus on the R&D and manufacturing of standard spare parts for lean equipment, Research on Low-Cost Intelligent Automation Application Scenarios depend on the Manufacturing site. 
Contact with us

Contact person: Kalisa

400: +86 400-8055-828 

Tel: +86-755-29554900 

Mobile phone: +86 15919917235 

E-mail: service@szsunqit.com 

Add: Block3# HongTianFu Industry Park GuanGuang RD. Dashuikeng Community FuCheng Street LongHua District Shenzhen China.

Copyright © 2026  Shenzhen Sunqit Electronics Technology Co., Ltd. | Sitemap

Customer service
detect