loading

How to design and install a lean pipe workbench?

The lean tube workbench is something we often see in the workshop. It is built from lean tubes and lean tube connectors, wooden boards, foot cups, electrical and other accessories. Today, SUNQIT will explain how to design and install a lean tube workbench? The following steps:

How to design and install a lean pipe workbench?

1. Understand the requirements: Determine the size and layout of the workbench based on actual work needs and space limitations. Ensure that the workbench can accommodate the required work items and tools, and provide sufficient workspace.

2. Material selection: Choose appropriate materials and structural design to ensure the stability and durability of the workbench. Common materials include steel, aluminum, etc. The structural design should consider the load-bearing capacity and stability of the workbench.

3. Safety considerations: Ensure the safety of the workbench, such as by designing anti slip surfaces, rounded corners, avoiding sharp edges, and other measures to reduce the risk of accidental injury to workers.

4. Height adjustment: Based on the height and work requirements of the staff, the height adjustable function of the workbench is designed to provide an ergonomic working environment and reduce work fatigue and discomfort.

5. Accessories and Accessories: Select suitable workbench accessories and accessories according to work needs, such as drawers, tool racks, power sockets, etc., to improve work efficiency and organization.

6. Installation and layout: According to the actual situation of the workplace, install and arrange the workbench reasonably to ensure its stability and convenient access.

7. Material preparation and cutting: Measure the size of lean pipes and mark the cutting position with a pen. Use a professional lean pipe manual cutter or metal cutting saw for vertical cutting to remove burrs at the incision site.

8. Assembly and bonding: Assemble the lean pipe workbench in a certain order, first attach the joints to the pipes, and then bond them together. Pay attention to left-right symmetry and assemble on a flat surface to prevent rotation of the joint direction.

9. Tabletop production: Place boards on the countertop and cut the countertop into corresponding sizes. Install the single code lock onto the rack, and finally install the workbench on the platform.

prev
How thick is the lean pipe workbench used?
What are the accessories for the wire rod lean tube workbench?
next
recommended for you
no data
Get in touch with us
SUNQIT focus on the R&D and manufacturing of standard spare parts for lean equipment, Research on Low-Cost Intelligent Automation Application Scenarios depend on the Manufacturing site. 
Contact with us

Contact person: Kalisa

400: +86 400-8055-828 

Tel: +86-755-29554900 

Mobile phone: +86 15919917235 

E-mail: service@szsunqit.com 

Add: Block3# HongTianFu Industry Park GuanGuang RD. Dashuikeng Community FuCheng Street LongHua District Shenzhen China.

Copyright © 2025  Shenzhen Sunqit Electronics Technology Co., Ltd. | Sitemap

Customer service
detect