This picture is made of aluminum tube .Model: GLTXX-G-X0010X
In the new age, the product quality is almost rigorous, it is the source of power for the birth of high-quality products. Good products are the real commitment of Sunqit to the market and consumers. Sunqit’s products can be recognized and trusted by the lots of consumers is inseparable from the rigorous experimental tests behind it.
The Lean-improvement pipe racking system can be easily converted, added, expand the application does not have borders. Lean manufacturing and improvement appropriate instrument. Do not have a similarly flexible, easy to alter, universal, easy to install and inexpensive system! By using the most flexible storage system can be constructed.
Lean pipes need to be designed with load capacity in mind. Strength can be increased by adding fulcrum, connecting parts and parallel use of double cladding plastic pipes.
Lean pipe equipment general assembly of principles and theories to the side with the film after the assembly line workbench. First the install assembly line workbench bearing pipe with two ends before they are installed in the middle. All between chuck and can are installed according to the requirements of design to ensure that each clamp screw in place. Can't use hard and chuck can hammer. To ensure the perpendicular to the ground when packed column. In order to avoid the uneven force of the whole wire rod frame to cause damage note: When cutting the plastic tube, pay attention to the deformation of plastic tube cutting. There may be special purpose members, such as insert frame, hook, etc., which need to be processed and configured.